Factory pre-delivery inspection of condensing unit reduces on-site commissioning failure rate and after-sales complaint for cold room export contractors. Standard PDI checklist includes pressure leak test, electrical continuity, phase sequence test, fan rotation check, safety switch action, oil level and controller function. Nitrogen leak test at 30 bar holding for 24 hours is mandatory; pressure drop less than 0.5 bar is qualified before charging refrigerant for running test. Running test records suction pressure, discharge pressure, current, oil temperature, fan operation and alarm trigger response under simulated load condition. Xiteliduo condensing unit HS 84186120 issues PDI report, test curve and wiring diagram together with shipment for overseas customer clearance and commissioning. Parallel rack condensing unit is tested compressor by compressor at factory; single faulty compressor will not be covered up by other running units during group test. Low temperature blast freezer condensing unit undergoes extended pull-down simulation test to verify low pressure stability and hot gas defrost function. Packaging for sea freight includes anti-rust oil, desiccant bag, sealed wiring terminal cover and wooden fumigated box to avoid salt and moisture damage. Condensing unit for Middle East project adds extra high-temperature aging test in factory, simulating 45℃ ambient continuous operation for 8 hours. Refrigeration exporter retains PDI record copy; the document serves as basis for troubleshooting if abnormal operation appears after container arrival.
技術サービス:+86-575-83665888;83068555
コンプレッサーホットライン:+86-18157593311
電気ヒーターチューブホットライン:+86-13857577938
Eメール:helenliu1983xtld@gmail.com
電気加熱管工場:紹興市嵊州市甘林鎮東湖村150号
コンプレッサー工場:紹興市嵊州市東国経済開発区679号
Copyright © 2026 浙江西特利多環境技術有限公司および嵊州市川利環境技術有限公司。無断転載・複製を禁じます。