Machine room commissioning is the final verification of the whole refrigeration system after installation, before formal handover. Standard start-up sequence: visual inspection → leak test → vacuum → refrigerant charging → oil check → single component test → load running. Leak test: pressurize with dry nitrogen, hold pressure and detect leak; vacuum target below 500 microns for POE oil system. Charging: charge liquid refrigerant into receiver side; never charge liquid directly into compressor suction port. Commissioning key parameters: superheat, subcooling, condensing pressure, suction pressure, oil level, defrost termination temperature. Xiteliduo provides commissioning checklist, operation manual and alarm troubleshooting document together with equipment. Acceptance items: temperature stability, pull-down time, running current, noise, vibration, all alarm function test. Operation log record: daily room temperature, pressure, ambient temperature, running hour, alarm event and maintenance action. Training for end user: normal operation, alarm judgment, forbidden operation, safe pump down procedure and refrigerant handling. Handover standard: all test data recorded, drawings updated as-built, spare parts list submitted. Refrigeration maintenance & repair company recommends 72 hours continuous load running test before final acceptance.
技術サービス:+86-575-83665888;83068555
コンプレッサーホットライン:+86-18157593311
電気ヒーターチューブホットライン:+86-13857577938
Eメール:helenliu1983xtld@gmail.com
電気加熱管工場:紹興市嵊州市甘林鎮東湖村150号
コンプレッサー工場:紹興市嵊州市東国経済開発区679号
Copyright © 2026 浙江西特利多環境技術有限公司および嵊州市川利環境技術有限公司。無断転載・複製を禁じます。